|
Aircraft information is subject to verificaton upon inspection and the aircraft is subject to prior sale or removal from the marketplace
|
2010 BOMBARDIER CHALLENGER 605
Price: Make Offer
Total Hours: 0
Total Landings: 0

Aircraft Highlights
- Scheduled Delivery Date: May 2010
- JAA Requirements Package
- Floorplan Option #2
- 3D Map and Long Range Cruise
- Lightning Detection System (LDS)
- Enhanced Maps on MFD

Avionics
- 3D Map and Long Range Cruise
- Lightning Detection System (LDS)
- Enhanced Maps on MFD

Features & Options
- Additional Cabin Handset - Wireless @ RH2
- Microwave Oven
- Pull-Out Work Surface, Galley Forward Tower
- Pull-Out Work Surface, Galley Aft Tower
- 2nd Refuel/Defuel Panel
- Avionics Bay Light
- Aft Equipment Storage Box
- Main Wheel Storage
- Maintenance Ladder
- Foreign Certification

Interior & Exterior
EXTERIOR OPTIONS
- Wing Registration Numbers (set)
- Country Flag
- External Compartment Lights
CUSTOM ENGINEERING
- To stain the veneer, supplier: Carl Booth, species: Qtr Figured Australian Walnut
- To remove the baseline inlays from all pullout tables conference grouping tables and meal tray tables.
- A conference grouping and conference table is substituted for the standard aft left-hand seats and pull-out table. Also, the sideledge width is reduced at the conference grouping to maximize aisle width. Additional gaspers, lights and oxygen masks are added to the PSUs. Additional stereo headsets, life vests are also supplied.
Download Challenger 605 Specification

Aviatrade Incorporated
New York, Los Angeles, Hong Kong, Beijing
Philip Rushton, President
Tel: 1-908-696-1174
Fax: 1-908-696-1175
Email: philiprushton@aviatrade.aero
|
|